Monday 28 March 2011

Main task

This is our final media product for our main task. We have filmed this video on many different occasions this is because the video was to complex to be filmed on one day as there were many different factors which have affected the time in which we filmed this video.

One factor which has affected the time in which this video was filmed is the equipment; by equipment I mean that the battery life of the camera was not very long and therefore we had to film what we could then recharge the battery so we could film again. This has been a small disadvantage to our project as it meant that we had less time to record and we had to use more days to record the movie.

Another factor which added to the number of days that we have used to record the film is the weather; this was an external factor to our production as this factor was not determined by any person in the group however it was the nature. This has affected the time in which we completed the task as we wanted to make the movie as professional as we could and therefore all the shots should of been made in the same weather conditions. On some days the weather was stopping us from recording the movie as on some days the weather was different than others and therefore the movie would not look good if in some shots there was sunny weather and in others there was rain. Although we were lucky to get enough days which allowed us to film all out scenes in time and in the same weather conditions.

No comments:

Post a Comment